To construct a 100-metre floating walkway, Superior Industrial supplied over 30 heavy-duty polyethylene modular docks at 3m x 1.5m enhanced by the Edge I handrail system with rotomoulded end caps to allow articulation every 3 metres and with kickrails. In addition, a pump pontoon with mesh FRP grating and Edge III stanchions was also supplied. A transition ramp, mooring block, tethers and several 250mm pipe floats were also supplied to complete the project.
Head Office & Manufacturing
20 Demand Ave
Arundel 4214, QLD, Australia
Mailing Address
Superior Group
P.O Box 202
Labrador 4215, QLD, Australia