The scope of works for this project included a service pontoon and access walkway for Tailings and Brine Management in a Uranium mine in the Northern Territory. A 40-metre-long aluminium gangway with FRP decking and EDGE III Handrail stanchions was designed and manufactured. The floating pontoon with stainless steel frame was built on 12 foam filled Capri floats with the addition of stainless-steel handrails with kickplates.
Head Office & Manufacturing
20 Demand Ave
Arundel 4214, QLD, Australia
Mailing Address
Superior Group
P.O Box 202
Labrador 4215, QLD, Australia