The scope for this BMA Coal project included a large pump pontoon for a pond that was installed at the end of 31 metre floating walkway with Edge I Handrails.
An 18 metre elevated gangway starting on land and adjoining the floating walkway completed the supply.
Head Office & Manufacturing
20 Demand Ave
Arundel 4214, QLD, Australia
Mailing Address
Superior Group
P.O Box 202
Labrador 4215, QLD, Australia